Contract started in August 2005 - OC300453, lasting two (02) years, considering detailing design, integration, Software Development, Commissioning, Start-up Power Operation Unit U-4180, considering integration via memory maps with the SDCD from ABB and Rockwell and GE Fanuc controllers; both in redundant configuration System.