Cases

First Libra field oil platform, already under production in Brazil

View Engineering and Automation communicates with great satisfaction and pride the departure of the Libra´s Pioneer - FPSO Platform Vessel, from the Jurong Shipyard Pte Ltd (JSPL) dock, in Singapore, to Santos Basin, in the Libra field.

Know more

Petrobras - P63

PFSO Type Platform (Floating, Production, Storage and Offloading) with processing capacity of 140,000 barrels of oil per day at Papa-Terra field in the Bacia de Campos

Know more

Cooling Tower COMPERJ U-5601

View Engineering was hired by FIDENS Engineering for the supply of skilled labor aimed at Engineering.

Know more

Gas Treatment Unit Automation in Caraguatatuba (UTCGA)

View was responsible for elaborating the screens, Supervision and Control System applications and database configuration, composed of two (2) SCADA servers (data in real time) with the iFIX 5.0 software in redundant configuration

Know more

Consortium QI - HDS REDUC: New HDS Unit (U-4500 and U-4580)

Contract started in July of 2009, lasting three (03) years, with full integration of 44 packages that compose and interconnect HDS 4500 and 4580 units

Know more

Consortium IQ - PLANGÁS REDUC: New Sphere Park - 8 new spheres

Contract started in October of 2009, lasting 15 months, for full integration of packages that make up the systems and interconnect the Coke Charging System

Know more

IESA engineering REDUC: Packet Integration – COKE loading system

Contract started in September of 2006, lasting for two (02) years, with full integration of packages that make up and interconnect the Coke Charging System.

Know more

SKANSKA: New COKE Processing Unit

Contract started in November of 2005, lasting two (02) and a half years, considering Document Analysis and certification thereof ensuring the integration between the various packages, memory maps elaboration for all packages of this system

Know more

IESA Engineering REDUC: New Torch System Unit (U-4180)

Contract started in August 2005 - OC300453, lasting two (02) years, considering detailing design, integration, Software Development, Commissioning, Start-up Power Operation Unit U-4180

Know more