Contract started in September of 2006, lasting for two (02) years, with full integration of packages that make up and interconnect the Coke Charging System, considering: detailed design, integration, Software Development, Commissioning, Start-up Assisted Operation Unit U-4180, considering integration via memory maps with DCS ABB, Cimplicity Supervision System, integration with SAP from BR Distribuidora through MDriver, Application Development for supervisory controllers and Rockwell and GE Fanuc; in addition to the services of certification of the communication networks and static tests, Dynamic and data transfer between the packages of this system.